In brief

  • North America’s rapid data center expansion is increasing the importance of timely, specialized technical workforce availability.
  • Construction, commissioning, and deployment roles must be sequenced against project milestones rather than sourced only when vacancies arise.
  • Infrastructure workforce performance depends on having the right expertise available at the right stage of delivery.
Modern data center with rows of server racks and blue lighting, highlighting workforce timing challenges, specialized technical staffing, and project execution risks in data center infrastructure.
DATA CENTER EXPANSION / WORKFORCE SEQUENCING / PROJECT EXECUTION

North America’s data center expansion is entering a phase where the ability to execute may become as important as the ability to invest.

According to CBRE, approximately 7,481 MW of data center capacity was under construction across North America’s eight primary markets in the first half of 2026. More than 80% of that capacity had already been preleased.

7,481 MW
CBRE / FIRST HALF OF 2026

of data center capacity was under construction across North America’s eight primary markets; more than 80% was already preleased.

The figures reflect extraordinary demand for digital infrastructure. They also expose a less visible challenge: converting development commitments into operational capacity requires specialized technical expertise at precisely defined stages of construction.

Capital can be committed years in advance. Engineering talent cannot always be mobilized with the same certainty.

01 / PROJECT DEPENDENCIES

The growing importance of workforce sequencing

Data center development involves several interconnected technical disciplines. Planning and design teams establish the engineering foundation. Construction professionals and MEP specialists execute the physical infrastructure. Commissioning engineers validate critical systems before network deployment and operations teams assume responsibility for the facility.

Each stage has its own workforce requirements, but the dependencies between them are equally important. A delay in electrical installation can affect commissioning. A shortage of experienced controls engineers can slow integrated systems testing. Limited availability of network deployment specialists can complicate the transition from facility readiness to usable computing capacity.

These are not simply recruitment problems. They are project dependencies with potential consequences for schedules, contractor coordination, and capital utilization.

JLL’s 2026 construction research illustrates the pressure developing across the broader delivery market. Contractors with data center exposure carried an average backlog of 12.2 months, compared with 8.3 months for contractors without such exposure.

Contractor backlog is not a direct measure of workforce shortages. However, it provides an important indication of how much future delivery capacity is already committed. For developers, that distinction matters. A qualified specialist may exist within the market but may not be available during the window in which a project requires that expertise.

02 / PROACTIVE PLANNING

Workforce intelligence belongs in project planning

Traditional recruitment often begins after a technical position becomes vacant. Infrastructure development requires a different approach.

Project leaders need visibility into specialized workforce requirements before critical milestones arrive. That includes understanding regional labor competition, anticipated mobilization lead times, technical qualifications, and the availability of professionals with experience in comparable operating environments.

It also requires distinguishing between roles that appear similar on paper but serve different purposes on a project. An electrical engineer supporting design and an engineer responsible for commissioning power-distribution systems may share professional foundations. Their project responsibilities, technical experience, and readiness requirements can differ substantially.

Recruitment based on job titles alone cannot adequately address those differences. At VDart EPC, our approach to specialized talent is informed by the relationship between engineering requirements, project phases, and deployment conditions.

This perspective is increasingly important as infrastructure investment expands across multiple regions and industries competing for overlapping technical skills.

03 / DELIVERY READINESS

A different measure of staffing performance

Time-to-fill remains a useful recruiting indicator, but it provides an incomplete picture of infrastructure workforce effectiveness.

A more relevant assessment considers whether critical technical capabilities were available when required, whether professionals possessed the necessary project-specific experience, and whether workforce gaps contributed to delivery delays. These measures connect staffing directly with project execution.

As data center development continues to accelerate, workforce planning will need to become more closely integrated with engineering schedules, procurement strategies, and operational milestones.

The competitive advantage will not come simply from securing more talent. It will come from knowing which expertise is needed, where it is available, and when the project must have it.

That is where specialized workforce intelligence becomes an infrastructure capability.